Project Info
Order Number State Project Number Last Date to Post Questions
F12 0007-053-086,C501,B668 8/20/2021
Question
Question Date: 8/16/2021
54" BPPS-1 shown on Bridge Plan sheet 1 of 49 and detailed on Roadway Plan sheets 2M(2) and 2M(3) does not appear to have any fill material in the space between to two lines of barriers located on the north and south sides of the pier columns. Is it the intent of the Owner to leave this space empty?
Answer History
Previous Answers PostDate
See cross sections 65 to 69 for slopes concerning the area behind the bridge pier protection system. 8/24/2021
See cross sections 65 to 69 for slopes concerning the area behind the bridge pier protection system. 8/24/2021