Question
Question Date: 7/15/2021
Can you provide the Departments plans or sketches of crane locations and sizes that show the remaining powers lines are not in conflict?
Answer History
Previous Answers PostDate
The Department evaluated a pick plan utilizing dual cranes from the roadway, one on each side of the structure. The existing electric facilities are under 50kva, so the clearance requirement is 10ft. The sketch has been uploaded to Projectwise for informational purposes. 7/22/2021
The Department evaluated a pick plan utilizing dual cranes from the roadway, one on each side of the structure. The existing electric facilities are under 50kva, so the clearance requirement is 10ft. 7/16/2021