Project Info
Order Number State Project Number Last Date to Post Questions
C97 0007-029-381,B643 7/17/2020
Question
Question Date: 7/16/2020
Addendum 1 stated to replace (bridge) plan sheets 2, 9,16,20A, and 21. There was no previous sheet 20A (Bridge Conduit System), only sheet 20 (CPSR Rail). The updated plan sheets on projectwise no longer contain the original plan sheet 20. Was this sheet supposed to be removed? If not can it be added back to the plans?
Answer History
Previous Answers PostDate
Sheet 20A of 21 was added in Addendum 1. There is no change to Sheet 20 of 21 and it has been uploaded to ProjectWise. 7/18/2020
Sheet 20 has been made visible again in ProjectWise. 7/17/2020