C94 0360-004-664 C501, B607, B608 7/17/2020
Question
Question Date: 7/13/2020
Under which pay item will the removal of the 6” Aggregate Base Material used for the crossovers be paid?
Answer History
Previous Answers PostDate
It is included in the measurement and payment of demolition of pavement. 7/16/2020
In addition to the items listed in the question, the REGULAR EXCAVATION pay item also includes removal of strip of existing asphalt pavement adjacent to the existing curb and gutter to be removed, as shown on sheets C2A(01) and C2A(02). 7/16/2020